The evidence standard

Evidence first.
Then a signature.

A qualifying signer needs a record that supports the building’s actual compliance. The process connects the documents, the people responsible and the evidence behind the work.

See what the review needs

Five parts of the record

What the review
needs to establish.

Tier 2 currently requires benchmarking, an energy use intensity target, an EMP, an O&M program and applicable reporting evidence.

Rules checked October 25, 2026. Current qualification: Jeff Casey completed QEM training on October 26, 2026, supported by seven years of relevant building-services and energy-project experience. Scope, owner designation and building-specific evidence are confirmed for each engagement.

Sample evidence index

Illustrative outline only.

  1. 01

    Owner source records

    Building identity & floor area

    Confirm the building’s identity, activities and floor area. The preparer reconciles the reporting property and identifies questions that need review.

  2. 02

    Authorized utility records

    Whole-building energy data

    Check the applicable reporting periods, energy sources and data gaps. Keep the source records behind the calculations.

  3. 03

    The on-site building lead

    Equipment & maintenance information

    Supply dated photographs, service documents, logs and available controls information supporting the building’s actual operations.

  4. 04

    The building owner and team

    An implemented EMP & O&M program

    Name the people responsible for implementation and provide records supporting actual use and maintenance. A prepared document alone does not establish implementation.

  5. 05

    The qualifying signer and authorized submitter

    Designation, review & approval

    The qualified signer checks the evidence. The named authorized submitter obtains owner approval before the agreed submission.

The building team’s role

Implementation
belongs in the record.

The owner implements the plans and provides evidence of the work. A remote walkthrough may support the review when appropriate. Missing records call for a building-specific plan.

The required energy-data window and evidence of implementation are distinct. There is no blanket additional twelve-month waiting period for every newly implemented program.

Utility groups and April checkpoints in the building check are internal planning allowances. Actual authorizations, meter matching, data gaps, owner implementation and capacity determine the accepted schedule.

Clear boundaries

A signature follows
the evidence.

A qualifying signer may decline when evidence is insufficient or contradictory. Attestation does not provide an equipment-condition warranty, an engineering opinion or a Tier 1 audit.

Agency acceptance, incentives, payment dates, penalty relief and utility turnaround are not guaranteed.

Official guidance & sources

Sources

  1. Washington Department of Commerce, CBPS Tier 2 compliance
  2. Commerce, Tier 2 Early Adopter Incentive Program
  3. WAC 194-50, Clean Buildings Performance Standard
  4. RCW 19.27A.170, utility energy consumption data

Start with your property

Start with the records you have.

Share the building basics and the work you already have in place.

Explore a building assessment jeff@meterandmortar.com(618) 402-1177Start with a building review · No booking or payment required